Hillsboro Airport Traffic Control Tower construction
Title
Hillsboro Airport Traffic Control Tower construction
Description
Black and white image mounted on cardboard of the steel framing for an airport control tower. The top of the building has been mostly framed in in glass. The tower was added to the existing airport in 1965, after the Port of Portland took control of the airport.
[front] [typed label] Federal Aviation Agency, Hillsboro, ATCT Type O, looking at Column 5, September 28, 1965. Phase 2, contractor St. Joseph Structural Steel Company.
Date Created
9/28/1965
Place
Medium
copy prints
Language
English
Identifier
WCMpic_012445
Rights
Online access to this image is for research and educational purposes only. To inquire about permissions, order a reproduction, or for more information, please contact the Five Oaks Museum at Research@FiveOaksMuseum.org.
http://rightsstatements.org/vocab/CNE/1.0/
Type
Still Image